Get Ready to Pass the FlashArray-Implementation-Specialist exam Right Now Using Our Pure Storage FAIS Exam Package [Q49-Q72]

5/5 - (1 vote)

Get Ready to Pass the FlashArray-Implementation-Specialist exam Right Now Using Our Pure Storage FAIS Exam Package

Enhance Your Career With Available Preparation Guide for FlashArray-Implementation-Specialist Exam

Pure Storage FlashArray-Implementation-Specialist Exam Syllabus Topics:

Topic Details
Topic 1
  • Post-Installation
  • Upgrade: This section of the exam measures the skills of FlashArray Implementation Specialists and evaluates how professionals confirm system functionality after installation or an upgrade. It involves validating connectivity, running health checks, confirming configurations, and ensuring that the deployment meets operational expectations.
Topic 2
  • Pre-Installation
  • Upgrade: This section of the exam measures the skills of Enterprise Infrastructure Technicians and covers all preparation activities before deploying or upgrading a Pure Storage FlashArray. It includes understanding environmental requirements, verifying prerequisites, checking compatibility, and validating system readiness through appropriate tools and documentation.
Topic 3
  • Upgrades: This section of the exam measures the skills of FlashArray Implementation Specialists and focuses on tasks involved in managing firmware and software upgrades. Candidates must demonstrate knowledge of upgrade planning, verification steps, and rollback procedures, ensuring that systems are updated with minimal disruption to service.
Topic 4
  • Installation: This section of the exam measures the skills of Enterprise Infrastructure Technicians and focuses on executing a successful installation of FlashArray systems. It tests the ability to perform physical setup, cabling, configuration of network settings, and the application of initial system configurations necessary for full deployment.

 

NO.49 An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?

 
 
 

NO.50 Which PCIe slot supports 4-port FC cards on FlashArray//XL?

 
 
 

NO.51 What command can be used to identify interface status?

 
 
 

NO.52 When performing an install on a FlashArray, what step should be taken first?

 
 
 

NO.53 When installing the first DirectFlash Shelf on a FlashArray//XR2/3, what mezzanine ports are used on the controllers?

 
 
 

NO.54 During a FlashArray//X to FlashArray//XL hardware upgrade, when should the Implementation Engineer insert the DFMd modules into the FlashArray//XL?

 
 
 

NO.55 An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf. What will be the resulting pair of interfaces?

 
 
 

NO.56 An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversation Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?

 
 
 

NO.57 An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?

 
 
 

NO.58 An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?

 
 
 

NO.59 An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?

 
 
 

NO.60 An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?

 
 
 

NO.61 What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?

 
 
 

NO.62 Which command should an Implementation Engineer use to allow Support access to an array?

 
 
 

NO.63 In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?

 
 
 

NO.64 What upgrade scenario required an upgrade of power supplies?

 
 
 

NO.65 Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?

 
 
 

NO.66 What command should the Implementation Engineer run to configure a proxy?

 
 
 

NO.67 After performing a hardware upgrade from an //M20R2 to a //X20R3-EMEZZ, a customer wants to add a Direct Flash Modules data pack to replace the existing SAS Chassis Data Packs (2x 20TB DPs). What extra hardware is required?

 
 
 

NO.68 An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a “health not responding” status when running status. Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

 
 
 

NO.69 An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs. What should the Implementation Engineer do to get the array using a 20-module Wide write group?

 
 
 

NO.70 On a FlashArray//X50 R2/R3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

 
 
 

NO.71 If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?

 
 
 

NO.72 What is the rack unit height of a FlashArray//XL?

 
 
 

Get Special Discount Offer of FlashArray-Implementation-Specialist Certification Exam Sample Questions and Answers: https://www.troytecdumps.com/FlashArray-Implementation-Specialist-troytec-exam-dumps.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

troytecdumps

Learn More →

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below